Motorists are advised of changed traffic conditions today, Wednesday, on Giinagay Way at Warrell Creek for signage work to be carried out.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
Work will be carried out between Warrell Creek village and Bald Hill Road interchange from 7am until 6pm weather permitting.
Traffic control and a reduced speed limit of 40km/h will be in place for the safety of workers and motorists.
Motorists are advised to drive to the conditions, follow the direction of signs and traffic control.
Roads and Maritime Services thanks motorists for their patience during this time.
For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.