Motorists are advised of changed traffic conditions on the Pacific Highway as part of Warrell Creek to Coffs Harbour Pacific Highway upgrade between Upper Warrell Creek Road and the Bald Hill Road interchange.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
Work will involve asphalting, line marking, and building connections to the existing highway.
Motorists travelling north and south on the Pacific Highway will temporarily use the Bald Hill Road interchange for around two to three days from tomorrow, Tuesday, weather permitting.
To access Scotts Head Road from the north, motorists will use Bald Hill Road interchange and travel south on Giinagay Way to Scotts Head Road.
From the south, motorists will continue to use the existing highway through Warrell Creek and then access Scotts Head Road.
Access arrangements at Upper Warrell Creek Road will also change with a left turn in and left turn out at Upper Warrell Creek Road to exit and enter the new northbound lanes.
Traffic control and a reduced speed limit may be in place for the safety of workers and motorists.
Motorists are advised to plan their journey, follow all signs and drive to the conditions of the road.
Roads and Maritime thanks the community for its patience while this work is carried out.
For the latest traffic information visit livetraffic.com, download Live Traffic App or call the Transport Management Centre on 132 701.
Highs and lows so far: